Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

DEALINGS ON ’CHANGE

Saturday’s Business RETURN ON INVESTMENTS not been taken loans hmlX O,l rP(lenH)t!on.s s n^r^ ( period for which the loans are tax-free. WELLINGTON. p c

Sydney Stock Exchange By Telegraph—Press Assn. —Copyright. Sydney, May 2. Stock Exchange sales to-day included: —Commonwealth bonds, 4 f P-c._. IO” 8 . £lO2/8/9; 1950, £lO2/i/6;*1?oi, £103; Commercial Bank of Australia, -O/lj, Union Bank, £9/15/-; Anthony Hordern 19/9; Associated News, 22/4J; Colonia. Sugar, £42; Dunlop-Perdrinu Rubber. 16/1 j; James Stedman, 17/101. British Treasury Bills ~ , Condon, May 1. The total amount applied for in tenders for £45,000,000 Treasury bills was £73,510,000. The average rate per cent, for bills at three months was 10/6.20, against 10/6.27 a week ago. Mining Shares in London London. May 1. Sales of mining shares include: —Bulolo, £6/10/-; New Guinea, 3/3; Mount Lyell, 19/3. Gold Mining Returns Bv Telegraph.—Press Association. Greymouth, May 3. The Mossy Creek dredge returned 490 z. sdwt. from 13,619 yards in 137 hours. The Argo dredge return was 660 z. from 13.500 yards in 124 hours. Worksop dredge, no return for the past week. , Maori Gully dredge also no return for the past week, as' operations were stopped for four days .to enable the dredge to negotiate a very difficult bend. OperationtTwere resumed on Thursday, proceeding smoothly. The dredgemaster anticipates another three weeks will take him through the' very narrow part of the gorge, and past all difficult .bends.. Dunedin, May 3. The secretary of the Gillespie’s Beach Company reports a return of l_oooz. 2dwt. for 136 hours. _ Big River Report Big River Gold Mines, Ltd., report for the week ending April 29:—Repairs to. shaft above No. 2 chamber.: New- sets have been placed in a position to a point 31ft; above the cap of No. 2 chamber. The bad ground mentioned in the last report has beefi passed through and working conditions appear to be improving. The shaft has been relined for about half the distance to No. 1 intermediate level (the latter is 84ft. above No. 2 level). Repairs to dam: Heavy rain last week filled the dam to overflowing. This tested the repairs to the bottom of the dam and proved them satisfactory. The work of repairing the upner timber face and buildnig the clay wall against it is proceeding as weather . .permits.

Comim Bank of Aust., Sale price. on investment. £ s. d. 4 5 4 £ ♦9 s. U. 7 0 Kayvang Tin . ♦0 9 0 — ♦Late sale Friday. AUCKLAND. s. d. £ s. d. Inscr. Stk.. 4 p.c., 1949 103 10 0. 3 13 11 9 11 fl Union Bank u Blackwater Mines ... 1 9 CHRISTCHURCH. £» d. £ s. d. Mortgage Corpn (3) . 6 10 0 4 10 0 2 13 S N.Z Breweries (J) ••• — 3 0 0 British Tobacco ....•• 0 Whitcombe and Tombs 3 10 N.Z Newspapers .... Chch. Gas. 10/- paid . 0 0 16 0 3i DUNEDIN. £ s. d. £ s. d. Bank of N.Z. Colonial Sugar • 41 17 9 6 4 7 5 2 19 8

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19360504.2.101.3

Bibliographic details

Dominion, Volume 29, Issue 185, 4 May 1936, Page 12

Word Count
492

DEALINGS ON ’CHANGE Dominion, Volume 29, Issue 185, 4 May 1936, Page 12

DEALINGS ON ’CHANGE Dominion, Volume 29, Issue 185, 4 May 1936, Page 12