Letter in Brief
“In your report of the pterdM of th* Tawa Flat tunnel (August 28) we w«te surprised to reed a wrong statement rtr carding the origin of the drilling plant used,” writes B. J. Dunsheeth. The cofr respondent adds that his firm imported the new British Climax light drifter cradle drills, seven of which were brought by the Public Works Department, used on the Tawa Flat tunnel undem» ing. -
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19310905.2.120
Bibliographic details
Dominion, Volume 24, Issue 292, 5 September 1931, Page 9
Word Count
71Letter in Brief Dominion, Volume 24, Issue 292, 5 September 1931, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.