The picture shows the present state of the main road in to Raetihi. At present three miles of slush similar to the above has to be negotiated. The Main Highways Board, as stated elsewhere, plans to have the road metalled before next winter.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19280803.2.53.1
Bibliographic details
Dominion, Volume 21, Issue 260, 3 August 1928, Page 8
Word Count
43The picture shows the present state of the main road in to Raetihi. At present three miles of slush similar to the above has to be negotiated. The Main Highways Board, as stated elsewhere, plans to have the road metalled before next winter. Dominion, Volume 21, Issue 260, 3 August 1928, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.