Article image
Article image
Article image
Article image

RAILWAY LINE SUBSIDING

By Telegraph.—Press association. Greymouth, December . The subsidence on the railway line at Onioto continues despite the fact that 2000 tons of material are deposited daily in the gully, where a “greasy back” exists.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19261203.2.15

Bibliographic details

Dominion, Volume 20, Issue 59, 3 December 1926, Page 3

Word Count
36

RAILWAY LINE SUBSIDING Dominion, Volume 20, Issue 59, 3 December 1926, Page 3

RAILWAY LINE SUBSIDING Dominion, Volume 20, Issue 59, 3 December 1926, Page 3