Article image
Article image
Article image
Article image

LONDON DOCKS BEING ENLARGED

e i ADDITIONAL SHED STORAGE. 6 (R<ec, March 15, 0.15 a.m.) • J ■' London, March 14. In order to relieve the congestion at * the docks the Port of London Authority J is erecting additional sheds, with a stor- * age capacity of 35,000 tons.- A large 6 part of the work will be completed in i three weeks, and the whole in two months.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/DOM19150315.2.55

Bibliographic details

Dominion, Volume 8, Issue 2409, 15 March 1915, Page 6

Word Count
66

LONDON DOCKS BEING ENLARGED Dominion, Volume 8, Issue 2409, 15 March 1915, Page 6

LONDON DOCKS BEING ENLARGED Dominion, Volume 8, Issue 2409, 15 March 1915, Page 6