Article image
Article image
Article image
Article image
Article image
Article image

ABOVE A channel is cut through State highway 73 yesterday to lower the, flow of water from, the: flooded Hurunui River, near Hurunui. Right Workscorp staff build a diversion channel through a stopbank hearthe Hurunui River bridge outside Culverden to allow water, which had destroyed a large section of the stopbank upstream,' to;, return to the river. —Photograph by DAVID WETHEY.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19880915.2.5.1

Bibliographic details

Press, 15 September 1988, Page 1

Word Count
61

ABOVE A channel is cut through State highway 73 yesterday to lower the, flow of water from, the: flooded Hurunui River, near Hurunui. Right Workscorp staff build a diversion channel through a stopbank hearthe Hurunui River bridge outside Culverden to allow water, which had destroyed a large section of the stopbank upstream,' to;, return to the river. —Photograph by DAVID WETHEY. Press, 15 September 1988, Page 1

ABOVE A channel is cut through State highway 73 yesterday to lower the, flow of water from, the: flooded Hurunui River, near Hurunui. Right Workscorp staff build a diversion channel through a stopbank hearthe Hurunui River bridge outside Culverden to allow water, which had destroyed a large section of the stopbank upstream,' to;, return to the river. —Photograph by DAVID WETHEY. Press, 15 September 1988, Page 1