Well depth
The Tariki-2A sidetrack well reached a depth of 2398 metres by 6 a.m. yesterday, a 9% inch casing has been run and cemented in place and preparations are being made to ahead. Petrocorp said.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19870225.2.146.16
Bibliographic details
Press, 25 February 1987, Page 35
Word Count
36Well depth Press, 25 February 1987, Page 35
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.