Article image
Article image
Article image
Article image

Public Notices IN THE MATTER of the Sale of Liquor Act 1962 AND IN THE MATTER of an application by SHARPIN BROS. LIMITED (a company yet to be formed) for a Hotelkeepers licence NOTICE IS HEREBY GIVEN that an application has been made by RICHARD ANDREW SHARPIN of Culverden, Contractor, JUDITH LORRAINE SHARPIN of Culverden, Married Woman, TIMOTHY ERNEST SHARPIN of Culverden, Contractor, and JANE McFARLANE of Culverden, School Teacher for and on behalf of SHARPIN BROS., LIMITED (a company yet to be formed) for a Hotelkeepers licence In respect of the Hurunul Hotel, Main Road, Hurunul. Any person who wishes to object to the issue of a licence to the applicants may, not later than 14 days after the first publication of this notice, file notice of his Intention and of the grounds thereof with the Clerk of the North Canterbury Licensing Committee care of the District Court at Ranglora. SHARPIN BROS., LIMITED by. their solicitors and duly authorised agents Messrs Helmore Bowron and Scott, per D. M. Stewart. This is the second publication of this notice. IN THE MATTER of the sale of Liquor Act, 1962 and Its amendments AND IN THE MATTER of an application by STRATTON HOLDINGS LIMITED a duly Incorporated company having its registered office at Christchurch for a Tavernkeeper’s Licence STRATTON HOLDINGS LIMITED a duly Incorporated company having its registered office at 291 Madras Street, Christchurch, has made application to the Canterbury Licensing Committee for a Tavernkeeper’s Licence In repsect of the tavern premises situated at Main South Road, Islington and known as the ISLINGTON TAVERN. ANY PERSON who is entitled to object and wishes to object to the grant of this application may, not less than 14 days from the date of the first publication of this Notice, file a Notice In writing of his objection and of the grounds thereof with the Clerk of the Canterbury Licensing Committee at Christchurch. THIS Notice Is lodged by Messrs Clark, Boyce and Company, 267 Madras Street, Christchurch, Solicitors for the applicant. THIS is the first publication of this Notice. 124TH CANTERBURY SHOW NOVEMBER 12,13 and 14,1986 HORSE AND DOG TRIAL ENTRIES CLOSE SEPTEMBER 26 All other sections, October 6 SCHEDULES AVAILABLE FROM Canterbury A. and P. Assn, P.O. Box 9002, CHRISTCHURCH Or phone 64-201.

CHRISTCHURCH CITY COUNCIL P.O. BOX 13-047, CHRISTCHURCH, NEW ZEALAND Schedule of Charges and Fees Notice is hereby given that on and after the first day of October 1986, the present rates for electricity will be subject to the imposition of 10 percent Goods and Services Tax and charges for electricity will be in accordance with the following schedule. Supply will be given in accordance with the Department’s current Terms and Conditions for Supply and Sale, copies of which are available on application. The gross charges at which the Department undertakes to give electrical supply are based on the rates in force from time to time, plus 15c in each complete dollar. This latter part of the gross charge (15c in each complete dollar) will be allowed as discount if the account is paid within fifteen days of the meter reading date. Disconnection Feesl3.oo + $1.30 G.S.T. = $14.30 Reconnection Feesl3.oo + $1.30 G.S.T. = $14.30 Special Reading of Meter Feesl3.oo + $1.30 G.S.T. = $14.30 Meter Test Deposits3o.oo + $3.00 G.S.T. = $33.00 Reinspection Fees22.oo + $2.20 G.S.T. = $24.20 DOMESTIC SUPPLY Supply Charge—For each separately metered installation—loc per day plus 1c G.S.T. = 11c per day. DMI—DOMESTIC supply with controlled water heating 4.854 c per unit + 0.485 c G.S.T. =5.339c per unit. DM2—DOMESTIC UNCONTROLLED water heating 8.778 c per unit + 0.878 c G.S.T. =9.656c per unit. DM3—NIGHT RATE—available 11.00 p.m. to 7.00 a.m. for approved 10ad5—2.963c per unit + 0.296 c G.S.T. =3.259c per unit. NON DOMESTIC NDI—GENERAL—For installations with whole current metering. Supply Charge: for each separately meter installation—--23.3c per day + 2.33 c G.S.T. = 25.63 c per day. ail units at 12.18 c + 1.218 c G.S.T. = 13.398 c per unit. ND2—PREFERENTIAL CONTROLLED SUPPLY—AII units at 6.865 c + 0.686 c G.S.T. = 7.551 c per unit, plus supply charge as above where ND2 Is the sole tariff. Note: 1. Recommended as being suitable only for storage type or non essential load. 2. Not available with Bulk Tariff (ND4), Community Tariff (NDS) or Changeover Tariff (NDB). ND3—NIGHT RATE—Available 11.00 p.m. to 7.00 a.m. for approved loads —2.963 c per unit + 0.296 c G.S.T. = 3.259 c per unit. ND4—BULK SUPPLY—For installations of such size that current transformer metering is required for the standard uncontrolled day consumption. Energy Charge: 5.04 c per unit + 0.504 c G.S.T. = 5.544 c per unit Demand Charge: $7.56 per kVA per month + 76c G.S.T. = $8.32 per kVA per month. Supply Charge: For each separately metered installation—soc per day +sc G.S.T. = 55c per day. Discount:Where the installation is metered at 11,000 volts, a discount of 1.25% will apply. Where in addition the consumer provides his own transformers, a further 1.25% discount will apply. Note: Maximum Demand Indicators reset monthly and accounts issued monthly. NDS—COMMUNITY—SmaII registered hospitals and registered nursing homes, aged people's homes, clubrooms not let for hire, small suburban libraries, (not commercial book clubs), primary and secondary schools, colleges and churches, public swimming pools. Supply Charge: For each separately metered installation—23.3c per day + 2.33 c G.S.T. = 25.63 c per day. All units at 7.746 c + 0.775 c G.S.T. = 8.521 c per unit. ND6—COINCIDENT DEMAND—Suitable for large non domestic consumers. Charges on a monthly basis. (a) Supply Charge: For each separate point of metering—ss.oo per day + 50c G.S.T. = $5.50 per day. (b) Winter Demand Charge (Coincident): $69.82 per kVA + $6.98 G.S.T. = $76.80 per kVA of the average of the six consumer’s loads coinciding with the six Winter Demand periods of the Department, as charged by N.Z.E. These will occur on or between May 15th and September 15th and between the hours of 7.00 a.m. to 11.00 p.m. (c) Anytime Demand Charge (Coincident): $20.24 per kVA + $2.02 G.S.T. = $22.26 per kVA of the average of the six consumer’s loads coinciding with the six Anytime Demand periods of the Department, as charged by N.Z.E. (d) Consumer Demand Charge: $32.80 per kVA + $3.28 G.S.T. = $36.08 per kVA of annual maximum demand. (e) Day Energy Charge: For electricity supplied between the hours of 7.00 a.m. and 11.00 p.m. 3.95 c per unit + 0.395 c G.S.T. = 4.345 c per unit. (f) Night Energy Charge: For electricity supplied between the Hours of 11.00 p.m. to 7.00 a.m. 2563 c per unit + 0.296 c G.S.T. = 3.259 c per unit. (g) Reduction for 11,000 Volt Consumers: 1. For consumers metered at 11,000 volts who provide their own transformer(s), the consumer demand charge will be reduced by 10% 2. consumers metered at 11,000 volts, the tariff will be subject to a discount of 1%. ND7—WATERWORKS FOR LOCAL BODlES— Supply Charge: For each separately metered installation 23.3 c per day + 2.33 c G.S.T. = 25.63 c per day. All units at 4.854 c + 0.485 c G.S.T. = 5.339 c per unit, subject to peak control. NDB—NON DOMESTIC CHANGEOVER RATE— Supply Charge: For each separately metered installation 50c per day + 5c G.S.T = 55c per day. Day Energy Charge: Between 7.00 a.m. to 11.00 p.m. 12.528 c per unit + 1.253 c G.S.T. = 13.781 c per unit Night Energy Charge: Between 11.00 p.m. to 7.00 a.m. 2.963 c per unit + 0.296 c G.S.T. = 3.259 c per unit. Note: This rate is available only to suitable consumers engaged in baking, irrigation, breeding, horticulture or other approved use. SPECIAL RATES Builders Temporary Supply: Domestic Dwelling—Single Phase— $50.00 + $5.00 G.S.T. = $55 for 9 months. Domestic Dwelling—Three Phase—ss6.oo + $5.60 G.S.T. = $61.60 for 9 months. In excess of 300 units—l2.lBc per unit + 1.218 c G.S.T. = 13.398 c per unit. Non Domestic Construction Sites—All units at 12.18 c + 1.218 c G.S.T. = 13398 c per unit plus capital cost of installation. General Lighting: Public Conveniences—s3.7o per quarter + 37c G.S.T. = $4.07 per quarter. Public Lighting and Fountains—6.43oc per unit + 0.643 c G.S.T. = 7.073 c per unit. Traffic Lights—NDs Railway Crossing Lights and Barrier Arms—Lights only $3.70 per month each + 37c G.S.T. = $4.07 per month each Lights and Barrier Arms $5.06 per month each + 51c G.S.T. = $5.57 per month each. Other special Rates—Details available on application. J. H. GRAY GENERAL MANAGER AND TOWN CLERK

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19860830.2.177.7

Bibliographic details

Press, 30 August 1986, Page 56

Word Count
1,358

Page 56 Advertisements Column 7 Press, 30 August 1986, Page 56

Page 56 Advertisements Column 7 Press, 30 August 1986, Page 56