Tariki tests
The Tipoka-1 well, 17km north of Opunake In South Taranaki, was at a depth of 2694 metres by 6 a.m. yesterday. Petrocorp (Exploration), Ltd, said that at report time the well was drilling ahead. Detailed production testing of the Tariki-IA well, which is 14km to the south-east of. Inglewood, started on Monday afternoon. This programme will last between 15 and 20 days. Flow rates through various choke sizes would be announced as they became available.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19860723.2.153.30
Bibliographic details
Press, 23 July 1986, Page 37
Word Count
77Tariki tests Press, 23 July 1986, Page 37
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.