Article image
Article image
Article image
Article image

The pumping station, showing the pipeline entering the ground in the left foreground, with the main pumps (three) to the left back, and behind them the white prover loop.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19850628.2.92.1

Bibliographic details

Press, 28 June 1985, Page 13

Word Count
29

The pumping station, showing the pipeline entering the ground in the left foreground, with the main pumps (three) to the left back, and behind them the white prover loop. Press, 28 June 1985, Page 13

The pumping station, showing the pipeline entering the ground in the left foreground, with the main pumps (three) to the left back, and behind them the white prover loop. Press, 28 June 1985, Page 13