Article image
Article image
Article image
Article image

Demolition work proceeding on the old Methodist Mission Church in Cambridge Terrace yesterday. Salvable material from the building will be given to the Ferrymead Trust, and is likely to be used to build a hall for the second church planned for the Ferrymead township.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19820605.2.26.1

Bibliographic details

Press, 5 June 1982, Page 3

Word Count
44

Demolition work proceeding on the old Methodist Mission Church in Cambridge Terrace yesterday. Salvable material from the building will be given to the Ferrymead Trust, and is likely to be used to build a hall for the second church planned for the Ferrymead township. Press, 5 June 1982, Page 3

Demolition work proceeding on the old Methodist Mission Church in Cambridge Terrace yesterday. Salvable material from the building will be given to the Ferrymead Trust, and is likely to be used to build a hall for the second church planned for the Ferrymead township. Press, 5 June 1982, Page 3