Article image
Article image
Article image
Article image

A double-lane bridge being built over the channel through which the Clutha River will be diverted as part of the Clyde dam project in Central Otago. The Clutha River is being diverted to allow the dam to be built across the former river-bed. The Clyde power station is expected to start producing electricity in 1987.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19811027.2.30

Bibliographic details

Press, 27 October 1981, Page 4

Word Count
55

A double-lane bridge being built over the channel through which the Clutha River will be diverted as part of the Clyde dam project in Central Otago. The Clutha River is being diverted to allow the dam to be built across the former river-bed. The Clyde power station is expected to start producing electricity in 1987. Press, 27 October 1981, Page 4

A double-lane bridge being built over the channel through which the Clutha River will be diverted as part of the Clyde dam project in Central Otago. The Clutha River is being diverted to allow the dam to be built across the former river-bed. The Clyde power station is expected to start producing electricity in 1987. Press, 27 October 1981, Page 4