Article image
Article image
Article image
Article image

Tugs fail

PA Wellington Tugs failed yesterday to lift the grounded freighter Pacific Charger .from rocks off Baring Head. The attempt to free the holed ship was timed for high tide at 4.30 p.m.. but a swell . and gusting winds forced salvage officials to abandon the attempt.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19810603.2.44

Bibliographic details

Press, 3 June 1981, Page 6

Word Count
47

Tugs fail Press, 3 June 1981, Page 6

Tugs fail Press, 3 June 1981, Page 6