Article image
Article image
Article image
Article image

A section of the Adriatic Pipeline being lifted into place in southern Hungary. Crude oil from the Near Eagt will he conveyed from the Yugoslavian coast in the pipeline at at rate of 10 million tonnes annually. The. Hungarian stage is 1210 kilometres.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19810506.2.163

Bibliographic details

Press, 6 May 1981, Page 31

Word Count
43

A section of the Adriatic Pipeline being lifted into place in southern Hungary. Crude oil from the Near Eagt will he conveyed from the Yugoslavian coast in the pipeline at at rate of 10 million tonnes annually. The. Hungarian stage is 1210 kilometres. Press, 6 May 1981, Page 31

A section of the Adriatic Pipeline being lifted into place in southern Hungary. Crude oil from the Near Eagt will he conveyed from the Yugoslavian coast in the pipeline at at rate of 10 million tonnes annually. The. Hungarian stage is 1210 kilometres. Press, 6 May 1981, Page 31