Article image
Article image
Article image
Article image

MERIVALE MALL Mb; EASTER LATE NIGHT -TONIGHT-

[ Systems Analyst | B (PARABURDOO) B B Mining Applications -B ■■ Hamersley Iron, Australia's largest iron ore producer with operations ■ H ■■ located approximately 1,000 km north of Perth, invites applieatipns B M for the position of Systems Analyst at the Paraburdeo Mine Site. 9R The successful applicant will be involved with the design, develop- M BH ment and support of computer applications in the geological Mj evaluation, mine planning and production control areas, in co- ■■ m operation with geological and engineering staff. MM « Current technical computing applications in Hamersley Iron include: MB MB • Geological data bases. B BR • Ore body modelling. B| MB • Mine design and scheduling. MS • Grade production control. 91 * 'ReaMim® operations control. Mm On-site hardware includes Hewlett-Packard HP3OOO and HPIOOb flre computers, .interactive graphics terminals, digitising facilities and a sophisticated Calcomp plotting system, access will be available HM to an IBM Mainframe in Perth. All technical programming is Fortran . fiyj based, with appropriate data base and data entry utility software. Hamersley Iron is entering a period of exciting growth and develop- IB . ment in the technical computing field, and making use of some of g|a the most modern hardware and techniques available. Opportunities B B'S exist to pursue a career path in technical computing or engineering HB within the Company. M| Tertiary qualifications in- Engineering, Computing Science or a Kij numerate discipline are essential, with a minimum of 4-5 years 'M| M§| experience in technical computing activities and a strong Fortran Kg programming background. Previous experience in mining or civil M| M| engineering fields would be an advantage. IB’ Kg GENERAL INFORMATION: ■. The position will carry a generous salary. In addition a site allowance ' tffia of 20 per cent will be paid at our northern,.centres. Five weeks -- |B B| annual leave, generous leave loading, contributory superannuation IB RES fund, free accident insurance fund. Air fares to site on appointment |B SO ' and generous assistance with removal of personal effects! Pro rata 99 long service leave after five years. . 9g| Rental for first-class brick veneer married accommodation {fully M furnished) is minimal. •B| 99 Single accommodation in single air-conditioned serviced rooms MM with meals is very reasonable. M| gS| Paraburdoo is a well established modern town with all facilities " provided — medical, education to high school level, sporting, Ma shopping, colour TV, hotel/motel. Please write with full details to:- HE Senior Personnel Officer—Recruitment, 99 BL Harnersley Iron Pty. Lid. Jt ' B . ox A42,.G.P.0., PERTH,V.^6OO,I,•MtiFX]* :?>'~BBHBBMMHBBBHBHHBBBHBBBHHHBI^ 4 c’

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19800402.2.150.2

Bibliographic details

Press, 2 April 1980, Page 28

Word Count
413

Page 28 Advertisements Column 2 Press, 2 April 1980, Page 28

Page 28 Advertisements Column 2 Press, 2 April 1980, Page 28