Article image
Article image
Article image
Article image

This huge gap in the main road in the lower Otira Gorge is one of a number gouged out by floodwaters in the storm on Monday. In the background is the Yorkey’s Point bridge. Ministry of Works engineers estimate that it will be at least a week before traffic will be able to pass between Otira and Arthur’s Pass on a temporary track.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19791206.2.15

Bibliographic details

Press, 6 December 1979, Page 2

Word Count
63

This huge gap in the main road in the lower Otira Gorge is one of a number gouged out by floodwaters in the storm on Monday. In the background is the Yorkey’s Point bridge. Ministry of Works engineers estimate that it will be at least a week before traffic will be able to pass between Otira and Arthur’s Pass on a temporary track. Press, 6 December 1979, Page 2

This huge gap in the main road in the lower Otira Gorge is one of a number gouged out by floodwaters in the storm on Monday. In the background is the Yorkey’s Point bridge. Ministry of Works engineers estimate that it will be at least a week before traffic will be able to pass between Otira and Arthur’s Pass on a temporary track. Press, 6 December 1979, Page 2