Article image
Article image
Article image
Article image
Article image
Article image

Opawa Road signals soon?

Pcdestnau-crossing improveinems at mi Opawa Road shopping centre could p ooab y not wait lor the construction of a traffic bypass which was a' least several years away, the Christchurch City Councils work- and traffic committee has been told. since a late April meeting with community in eres; -part of r he road at the bend west nt -he H lathcole R ver has been resealed with a r<’i"i»r -urfrv* c eliminate greasy cond’tions that made ; d for heaw traffic ’o -b: >ke on wet days requirements fo pedestrian traffic signals c-miot be met at the shop-

ping centre but they are still a possibility if hazards per-i s:st. Better marking to warn motorists of the dangerous bend and pedestrians will: lalsi be tried. The Traffic Engineer (Mr. iM. L. Gadd) said a close' watch would be kept on the! ■ieeu for signals. But they; i might have to be linked to ai ;-ignal warnine device round I the bend. The City Engineer (Mr P. G. Scoular) emphasisesd that •signals did not necessarily make conditions safer for pedestrians because they | could be ignored or not] i seen. But they made it eas-j tier to apportion blame in! lease of accidents.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19790511.2.142

Bibliographic details

Press, 11 May 1979, Page 18

Word Count
204

Opawa Road signals soon? Press, 11 May 1979, Page 18

Opawa Road signals soon? Press, 11 May 1979, Page 18