Article image
Article image
Article image
Article image
Article image
Article image

Cable strengthened

PA Wellington 1 1 The inter-island power i link has been strengthened ■ to resist earthquake shocks, : according to a spokesman for the Ministry of Energy. : The cable had been switched off during daylight.

hours for the last four days for equipment to he strengthened, he said. The work had been completed by Sunday night. Thermal generation was increased to compensate for reduced transmission while the cable was out of action.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19781221.2.108

Bibliographic details

Press, 21 December 1978, Page 12

Word Count
72

Cable strengthened Press, 21 December 1978, Page 12

Cable strengthened Press, 21 December 1978, Page 12