Article image
Article image
Article image
Article image
Article image
Article image

Output up at Robe River

NZPA Sydney The Robe River iron-ore project raised the output of both fines and pellets in the year to June 30. Production figures released by Robe River, Ltd, a 35 per cent partner in -he project, showed that production of fines rose 23 per cent to the 9.1 M tonnes and the output of pellets 4.5 per cent to 4.3 M tonnes.

The output of ore rose 18 per cent to 14.3 M tonnes. The tonnage of ore and fines produced in the final quarter showed an improvement over the same period last year, but pellet production was reduced slightly by a major overhaul of the pellet plant.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19770804.2.155

Bibliographic details

Press, 4 August 1977, Page 20

Word Count
113

Output up at Robe River Press, 4 August 1977, Page 20

Output up at Robe River Press, 4 August 1977, Page 20