Article image
Article image
Article image
Article image

Sumner drainage

Sir, — Apart from some minor flooding in Summer during the recent heavy rains, it would appear that the district suffered very little in camparison with other districts in the city. I hope that the .people of Summer in their day-to-day living, spend a few silent moments giving thanks to the Christchurch Drainage Board for providing the stormwater relief drain which came into operation about February last year. Without this new drainage system, Sumner would continue to suffer from periodic flooding. The Sumner Residents’ Association also deserves thanks for negotiating with the Drainage Board over many years for this relief drain to be constructed. — Yours, etc., B. R. HANSEN. August 28, 1975.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19750829.2.71.3

Bibliographic details

Press, Volume CXV, Issue 33934, 29 August 1975, Page 8

Word Count
113

Sumner drainage Press, Volume CXV, Issue 33934, 29 August 1975, Page 8

Sumner drainage Press, Volume CXV, Issue 33934, 29 August 1975, Page 8