Website updates are scheduled for Tuesday September 10th from 8:30am to 12:30pm. While this is happening, the site will look a little different and some features may be unavailable.
×
Article image
Article image
Article image
Article image

Work has resumed on the construction of the new Fendalton Road bridge over the Wairarapa Stream. A town planning appeal against the taking of land for the realigned bridge was withdrawn by the landowners recently. An excavator at work in the stream is viewed through one of the temporary culverts.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19750411.2.7.1

Bibliographic details

Press, Volume CXV, Issue 33815, 11 April 1975, Page 1

Word Count
50

Work has resumed on the construction of the new Fendalton Road bridge over the Wairarapa Stream. A town planning appeal against the taking of land for the realigned bridge was withdrawn by the landowners recently. An excavator at work in the stream is viewed through one of the temporary culverts. Press, Volume CXV, Issue 33815, 11 April 1975, Page 1

Work has resumed on the construction of the new Fendalton Road bridge over the Wairarapa Stream. A town planning appeal against the taking of land for the realigned bridge was withdrawn by the landowners recently. An excavator at work in the stream is viewed through one of the temporary culverts. Press, Volume CXV, Issue 33815, 11 April 1975, Page 1