Article image
Article image
Article image
Article image

A cutting machine at work in a tunnel which is being constructed under Shakespeare Cliff, near Dover. The tunnel will give contractors access to the point at which they will begin work on the Channel tunnel later this year.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19740430.2.72

Bibliographic details

Press, Volume CXIV, Issue 33521, 30 April 1974, Page 9

Word Count
39

A cutting machine at work in a tunnel which is being constructed under Shakespeare Cliff, near Dover. The tunnel will give contractors access to the point at which they will begin work on the Channel tunnel later this year. Press, Volume CXIV, Issue 33521, 30 April 1974, Page 9

A cutting machine at work in a tunnel which is being constructed under Shakespeare Cliff, near Dover. The tunnel will give contractors access to the point at which they will begin work on the Channel tunnel later this year. Press, Volume CXIV, Issue 33521, 30 April 1974, Page 9