Article image
Article image
Article image
Article image

Piles being driven for the $800,000 overbridge across the railway lines at Durham Street. The bridge is expected to be completed by the end of 1975.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19731114.2.23

Bibliographic details

Press, Volume CXIII, Issue 33382, 14 November 1973, Page 2

Word Count
26

Piles being driven for the $800,000 overbridge across the railway lines at Durham Street. The bridge is expected to be completed by the end of 1975. Press, Volume CXIII, Issue 33382, 14 November 1973, Page 2

Piles being driven for the $800,000 overbridge across the railway lines at Durham Street. The bridge is expected to be completed by the end of 1975. Press, Volume CXIII, Issue 33382, 14 November 1973, Page 2