Piles being driven for the $800,000 overbridge across the railway lines at Durham Street. The bridge is expected to be completed by the end of 1975.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19731114.2.23
Bibliographic details
Press, Volume CXIII, Issue 33382, 14 November 1973, Page 2
Word Count
26Piles being driven for the $800,000 overbridge across the railway lines at Durham Street. The bridge is expected to be completed by the end of 1975. Press, Volume CXIII, Issue 33382, 14 November 1973, Page 2
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.