Article image
Article image
Article image
Article image

TOP: The acoustic tiles in the auditorium. TOP LEFT: Part of the massive exterior. ABOVE: In March, 1971, the auditorium roof was almost complete and the framing of the promenades has started. There is no foyer work yet.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19720929.2.229.4

Bibliographic details

Press, Volume CXII, Issue 33034, 29 September 1972, Page 28

Word Count
38

TOP: The acoustic tiles in the auditorium. TOP LEFT: Part of the massive exterior. ABOVE: In March, 1971, the auditorium roof was almost complete and the framing of the promenades has started. There is no foyer work yet. Press, Volume CXII, Issue 33034, 29 September 1972, Page 28

TOP: The acoustic tiles in the auditorium. TOP LEFT: Part of the massive exterior. ABOVE: In March, 1971, the auditorium roof was almost complete and the framing of the promenades has started. There is no foyer work yet. Press, Volume CXII, Issue 33034, 29 September 1972, Page 28