Article image
Article image
Article image
Article image

BRIDGE AND LOOP RAMP TO GIVE ACCESS TO PORT OF TIMARU.—Work is continuing on the bridge section of the loop access road from The Terrace across the railway line, and the memorial walks on Caroline Bay. The bridge is the first stage of the $5m transport plan for Timaru. The second phase includes the construction of the loop ramp, which will loop out over the bay and curl back under the overbridge. The over-all plan is designed to serve the needs of a population of 42,000 in Timaru in 1990.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19710326.2.31

Bibliographic details

Press, Volume CXI, Issue 32565, 26 March 1971, Page 3

Word Count
90

BRIDGE AND LOOP RAMP TO GIVE ACCESS TO PORT OF TIMARU.—Work is continuing on the bridge section of the loop access road from The Terrace across the railway line, and the memorial walks on Caroline Bay. The bridge is the first stage of the $5m transport plan for Timaru. The second phase includes the construction of the loop ramp, which will loop out over the bay and curl back under the overbridge. The over-all plan is designed to serve the needs of a population of 42,000 in Timaru in 1990. Press, Volume CXI, Issue 32565, 26 March 1971, Page 3

BRIDGE AND LOOP RAMP TO GIVE ACCESS TO PORT OF TIMARU.—Work is continuing on the bridge section of the loop access road from The Terrace across the railway line, and the memorial walks on Caroline Bay. The bridge is the first stage of the $5m transport plan for Timaru. The second phase includes the construction of the loop ramp, which will loop out over the bay and curl back under the overbridge. The over-all plan is designed to serve the needs of a population of 42,000 in Timaru in 1990. Press, Volume CXI, Issue 32565, 26 March 1971, Page 3