Article image
Article image
Article image
Article image

Technical Institute cafeteria

Work is nearing completion on the Christchurch Technical Institute cafeteria, which is due to open on Friday of next week. Costing more than $40,000, the cafeteria would seat 300 and was expected to be adequate, the principal of the institute (Mr C. V Gallagher) said on Friday. The cafeteria, in the converted Memorial Hall building, would be moved to the tower hall in about four years, Mr Gallagher said. The area of the stage in the hall would be used as an art gallery in which the institute’s collection of paintings, valued between $BOOO to $lO,OOO. would be hung. The collection included a Goldie and several by Austin Deans. The institute hopes to increase its collection.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19710208.2.36

Bibliographic details

Press, Volume CXI, Issue 32525, 8 February 1971, Page 5

Word Count
119

Technical Institute cafeteria Press, Volume CXI, Issue 32525, 8 February 1971, Page 5

Technical Institute cafeteria Press, Volume CXI, Issue 32525, 8 February 1971, Page 5