Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

MANAPOURI TUNNEL

Good Progress Reported

(N.Z. Press Association)

INVERCARGILL, May 30. Work underground on the Manapouri power scheme has been progressing steadily. During the week to midnight on Saturday the tail-race tunnel from the Deep Cove end of the project progressed 254 ft, compared with 287 ft the previous week, and the record 310 ft the week before that.

The best progress was on May 22, whet) the tunnel was advanced 56ft. The tunnel was 17,089 ft long on Saturday.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19670531.2.18

Bibliographic details

Press, Volume CVII, Issue 31383, 31 May 1967, Page 1

Word Count
80

MANAPOURI TUNNEL Press, Volume CVII, Issue 31383, 31 May 1967, Page 1

MANAPOURI TUNNEL Press, Volume CVII, Issue 31383, 31 May 1967, Page 1