Article image
Article image
Article image
Article image

MOTEL PLAN

Building At Glacier (N.Z. Press Association) HOKITIKA, March 28. The accommodation problem which has existed since the opening of the Haast Pass highway will be relieved with the construction of a 40-bed motel at Franz Josef Glacier. An early start will be made and the motels should be completed by November. One of the promoters said today that the two-storey motels would be built on a large area near the Post Office. More would be built as the demand required.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19670329.2.45

Bibliographic details

Press, Volume CVI, Issue 31330, 29 March 1967, Page 3

Word Count
82

MOTEL PLAN Press, Volume CVI, Issue 31330, 29 March 1967, Page 3

MOTEL PLAN Press, Volume CVI, Issue 31330, 29 March 1967, Page 3