Article image
Article image
Article image
Article image

Progress On Bridge

Excellent progress had been made on the construction of the new bridge over the Hawkins river on State highway 72, the Malvern County Council was told. The county engineer (Mr W. J. Bevis) said the last of the 35 piles had been driven, the 16 pre-cast beams had been erected and the crossbeams had been cast on the first span. Progress had been made with the decking.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19670313.2.86

Bibliographic details

Press, Volume CVI, Issue 31317, 13 March 1967, Page 10

Word Count
70

Progress On Bridge Press, Volume CVI, Issue 31317, 13 March 1967, Page 10

Progress On Bridge Press, Volume CVI, Issue 31317, 13 March 1967, Page 10