TREATMENT PLANT.—This plan shows the layout of the Christchurch Drainage Board’s sewage purification works at Bromley. Provision is made in the unit for the removal of suspended solids by screening and sedimentation and for biological oxidation of the flow before discharge into the oxidation ponds between Cuthberts road and the Estuary. The units are: influent structure (1), screen room (2), primary sedimentation tanks (3), trickling filters (4), secondary sedimentation tanks (5), sludge digesters (6), sludge lagoon (7), operations building (8).
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19660617.2.206.27.1
Bibliographic details
Press, Volume CVI, Issue 31088, 17 June 1966, Page 29 (Supplement)
Word Count
80TREATMENT PLANT.—This plan shows the layout of the Christchurch Drainage Board’s sewage purification works at Bromley. Provision is made in the unit for the removal of suspended solids by screening and sedimentation and for biological oxidation of the flow before discharge into the oxidation ponds between Cuthberts road and the Estuary. The units are: influent structure (1), screen room (2), primary sedimentation tanks (3), trickling filters (4), secondary sedimentation tanks (5), sludge digesters (6), sludge lagoon (7), operations building (8). Press, Volume CVI, Issue 31088, 17 June 1966, Page 29 (Supplement)
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.