Article image
Article image
Article image
Article image
Article image
Article image

Deviation At Waipara

It was hoped to start work next year on the three-mile deviation of the Main North road at Waipara, the District Highways Engineer (Mr J. G. Sullivan) told the National Roads Board, during its North Canterbury tour yesterday.

The deviation will start at the railway crossing to the south of Waipara, and run to the east of the railway line and township to rejoin the highway just north of the new bridge at Glenmark, on which work has started. The deviation will cross the Waipara river by a new 800 ft bridge, downstream from the railway bridge. An underpass will connect the highway to highway No. 7, to Culverden and the Lewis Pass.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19660528.2.10

Bibliographic details

Press, Volume CVI, Issue 31071, 28 May 1966, Page 1

Word Count
116

Deviation At Waipara Press, Volume CVI, Issue 31071, 28 May 1966, Page 1

Deviation At Waipara Press, Volume CVI, Issue 31071, 28 May 1966, Page 1