Article image
Article image
Article image
Article image

’Phone Cable Cut

One of the two trunk cables connecting Rangiora and Kaiapoi telephone subscribers with Christchurch was cut early yesterday afternoon by a contractor working on the Main North road near Factory road. A Post Office repair gang of about six men was splicing a new piece into the cable last evening, and probably would finish early this morning, said the Post Office regional engineer (Mr H. W. Wilkinson). Circuits within the other cable had been rearranged to provide a reduced service in the meantime. Kaiapoi subscribers were more likely to have calls delayed than subscribers served by the Rangiora and outlaying exchanges, Mr Wilkinson said.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19660517.2.12

Bibliographic details

Press, Volume CV, Issue 31061, 17 May 1966, Page 1

Word Count
107

’Phone Cable Cut Press, Volume CV, Issue 31061, 17 May 1966, Page 1

’Phone Cable Cut Press, Volume CV, Issue 31061, 17 May 1966, Page 1