Article image
Article image
Article image
Article image

HEART OF THE WORKS.—This will be the heart of the new fertiliser works which is taking shape at Seadown, near Timaru. It is where the superphosphate is made and includes the machinery for grinding the rock phosphate, four tanks for holding the ground phosphate and lime and the Broadfield continuous process superphosphate manufacturing den.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19660423.2.79.1.1

Bibliographic details

Press, Volume CV, Issue 31042, 23 April 1966, Page 8

Word Count
54

HEART OF THE WORKS.—This will be the heart of the new fertiliser works which is taking shape at Seadown, near Timaru. It is where the superphosphate is made and includes the machinery for grinding the rock phosphate, four tanks for holding the ground phosphate and lime and the Broadfield continuous process superphosphate manufacturing den. Press, Volume CV, Issue 31042, 23 April 1966, Page 8

HEART OF THE WORKS.—This will be the heart of the new fertiliser works which is taking shape at Seadown, near Timaru. It is where the superphosphate is made and includes the machinery for grinding the rock phosphate, four tanks for holding the ground phosphate and lime and the Broadfield continuous process superphosphate manufacturing den. Press, Volume CV, Issue 31042, 23 April 1966, Page 8