Article image
Article image
Article image
Article image

AVIEMORE HYDRO-ELECTRIC PROJECT.—A general view showing the progress made with construction work on the Waitaki river. It is expected the river will be diverted through the tunnel next month to enable the dam to be built.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19650715.2.83

Bibliographic details

Press, Volume CIV, Issue 30803, 15 July 1965, Page 10

Word Count
36

AVIEMORE HYDRO-ELECTRIC PROJECT.—A general view showing the progress made with construction work on the Waitaki river. It is expected the river will be diverted through the tunnel next month to enable the dam to be built. Press, Volume CIV, Issue 30803, 15 July 1965, Page 10

AVIEMORE HYDRO-ELECTRIC PROJECT.—A general view showing the progress made with construction work on the Waitaki river. It is expected the river will be diverted through the tunnel next month to enable the dam to be built. Press, Volume CIV, Issue 30803, 15 July 1965, Page 10