Article image
Article image
Article image
Article image

A WORKSHOPS building in course of construction for the new Agricultural Engineering Institute at Lincoln. It is expected to be occupied in about two months.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19650703.2.90.1

Bibliographic details

Press, Volume CIV, Issue 30793, 3 July 1965, Page 10

Word Count
25

A WORKSHOPS building in course of construction for the new Agricultural Engineering Institute at Lincoln. It is expected to be occupied in about two months. Press, Volume CIV, Issue 30793, 3 July 1965, Page 10

A WORKSHOPS building in course of construction for the new Agricultural Engineering Institute at Lincoln. It is expected to be occupied in about two months. Press, Volume CIV, Issue 30793, 3 July 1965, Page 10