Article image
Article image
Article image
Article image

A MODEL OF THE CHRISTCHURCH HOSPITAL’S proposed new boiler house and workshops as they will appear from Antigua street. The chimney will be 180ft high, or 60ft higher than the existing chimney on the hospital site. The model was prepared by the architects, Messrs Manson, Seward and Stanton. The date for the completion of the contract is March, 1966.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19640903.2.192

Bibliographic details

Press, Volume CIII, Issue 30536, 3 September 1964, Page 18

Word Count
59

A MODEL OF THE CHRISTCHURCH HOSPITAL’S proposed new boiler house and workshops as they will appear from Antigua street. The chimney will be 180ft high, or 60ft higher than the existing chimney on the hospital site. The model was prepared by the architects, Messrs Manson, Seward and Stanton. The date for the completion of the contract is March, 1966. Press, Volume CIII, Issue 30536, 3 September 1964, Page 18

A MODEL OF THE CHRISTCHURCH HOSPITAL’S proposed new boiler house and workshops as they will appear from Antigua street. The chimney will be 180ft high, or 60ft higher than the existing chimney on the hospital site. The model was prepared by the architects, Messrs Manson, Seward and Stanton. The date for the completion of the contract is March, 1966. Press, Volume CIII, Issue 30536, 3 September 1964, Page 18