Article image
Article image
Article image
Article image

ROAD BOARD SUBSIDY

City Transport Survey (From Oar Own Reporter) WELLINGTON. Feb. 30. A master transportation survey of th* Christchurch metropolitan area, to be undertaken by th* Christchurch Regional Planning Authority, will coat £lOB,OOO The National Road* Board was told that the Christchurch authority ha* so far spent £57,800 on it* master transportation plan. In toe case of toe other authorities, consultant* are doing the job. The Christchurch authority ha* suggested that after completing the survey to preliminary design stag**, it should be responsible also for detailed geometric design of to* proposal*. The Ministry of works will be responsible for the engineering work on the motorway proposals affecting the State highway route. The board agreed to contribute 30 per cent of th* cost of th* master transportation surveys for the four areas, but the responsible authorities are to be informed that ahy extension of toe survey beyond the outline geometric* stage will not be eligible for subsidy.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19630221.2.65

Bibliographic details

Press, Volume CII, Issue 30062, 21 February 1963, Page 8

Word Count
157

ROAD BOARD SUBSIDY Press, Volume CII, Issue 30062, 21 February 1963, Page 8

ROAD BOARD SUBSIDY Press, Volume CII, Issue 30062, 21 February 1963, Page 8