Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

Drainage Board Offices

Amended plans for this new five-storeyed building for the Christchurch Drainage Board in Cambridge terrace were approved by the board last evening. The total estimated cost of the building, which has been designed by Mr Paul Pascoe,

■ is £189,200. > Amendments approved last I evening incorporated the > requirement of the Local . Authorities Loans Board that the originally-proposed in- ’ complete floor be completed, i The original fourth floor, for , a board room and construc-

tion engineers’ accommodation, became the second floor, and the fourth floor became ■ space for letting. The board authorised Mr Pascoe to proceed with ■ detailed drawings and specifications.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19621121.2.173

Bibliographic details

Press, Volume CI, Issue 29985, 21 November 1962, Page 20

Word Count
102

Drainage Board Offices Press, Volume CI, Issue 29985, 21 November 1962, Page 20

Drainage Board Offices Press, Volume CI, Issue 29985, 21 November 1962, Page 20