Drainage Board Offices
Amended plans for this new five-storeyed building for the Christchurch Drainage Board in Cambridge terrace were approved by the board last evening. The total estimated cost of the building, which has been designed by Mr Paul Pascoe,
■ is £189,200. > Amendments approved last I evening incorporated the > requirement of the Local . Authorities Loans Board that the originally-proposed in- ’ complete floor be completed, i The original fourth floor, for , a board room and construc-
tion engineers’ accommodation, became the second floor, and the fourth floor became ■ space for letting. The board authorised Mr Pascoe to proceed with ■ detailed drawings and specifications.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19621121.2.173
Bibliographic details
Press, Volume CI, Issue 29985, 21 November 1962, Page 20
Word Count
102Drainage Board Offices Press, Volume CI, Issue 29985, 21 November 1962, Page 20
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.