Article image
Article image
Article image
Article image

THE REBUILT CHELSEA BARRACKS, LONDON. THE FOUNDATIONS OF THE BUILDINGS, WHICH WILL BE USED BY THE BRIGADE OF GUARDS, WERE LAID IN JUNE, 1960. THE ESTIMATED COST IS £2,250,000.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19620622.2.8

Bibliographic details

Press, Volume CI, Issue 29855, 22 June 1962, Page 3

Word Count
29

THE REBUILT CHELSEA BARRACKS, LONDON. THE FOUNDATIONS OF THE BUILDINGS, WHICH WILL BE USED BY THE BRIGADE OF GUARDS, WERE LAID IN JUNE, 1960. THE ESTIMATED COST IS £2,250,000. Press, Volume CI, Issue 29855, 22 June 1962, Page 3

THE REBUILT CHELSEA BARRACKS, LONDON. THE FOUNDATIONS OF THE BUILDINGS, WHICH WILL BE USED BY THE BRIGADE OF GUARDS, WERE LAID IN JUNE, 1960. THE ESTIMATED COST IS £2,250,000. Press, Volume CI, Issue 29855, 22 June 1962, Page 3