Article image
Article image
Article image
Article image
Article image
Article image

Scarborough Power Supply Protection

Interruptions to power supply on the Scarborough-Tay-lor’s Mistake-Godley Head line which are carried back into the Scarborough supply as far as the substation in Head street. Sumner, have caused a good deal of annoyance to Scarborough residents.

The Municipal Electricity Department has now arranged to buy an automatic re-dosing circuit for overhead mounting on the line between Scarborough and Taylor’s Mistake to avoid the trouble.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19611118.2.220

Bibliographic details

Press, Volume C, Issue 29674, 18 November 1961, Page 16

Word Count
69

Scarborough Power Supply Protection Press, Volume C, Issue 29674, 18 November 1961, Page 16

Scarborough Power Supply Protection Press, Volume C, Issue 29674, 18 November 1961, Page 16