Article image
Article image
Article image
Article image
Article image
Article image

DELAY AT WELL

Broken Drill String IN.Z Press Association) NEW PLYMOUTH. June 8. A broken section of the drilling string at the Mangahewa No. 1 oil well at Tikorangi has delayed the testing of the second testing level by several days The drilling string twisted off in the vicinity of 11,000 feet Trouble began when a sealing plug lammed in the hole and had to be drilled out It was while this was being done that the string broke. The general manager of Shell-B P -Todd Oil Services Ltd (Mr D. S Watt), said today that it could now be Saturday or Sunday. In pouring rain and a cold southerly, the Minister of Mines (Mr Shand) wearing a protective helmet, inspected the Maegahewa No. 1 oil well at Tikorangi today. The site was surrounded in an inchesdeep sea of mud.

Sergeant B D Read ba? been apoointed tc the prosecutions branch at the Centra’ Police Station in place of Sergeant T. A A. Maroon, who has been transferred to Taupo.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19610609.2.80

Bibliographic details

Press, Volume C, Issue 29535, 9 June 1961, Page 12

Word Count
170

DELAY AT WELL Press, Volume C, Issue 29535, 9 June 1961, Page 12

DELAY AT WELL Press, Volume C, Issue 29535, 9 June 1961, Page 12