Article image
Article image
Article image
Article image

Extension Of Wharf

Plans and estimates for the extension of the low level breastwork have been ordered by the Lyttelton Harbour Board. The reconstruction of the No. 2 breastwork had been completed, reported the engineer-in-chief (Mr J. A. Cashin), and the decking surfaced with tar and sand. Work was proceeding on the parking area, 45 bearing piles having been driven.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19601215.2.43

Bibliographic details

Press, Volume XCIX, Issue 29388, 15 December 1960, Page 7

Word Count
60

Extension Of Wharf Press, Volume XCIX, Issue 29388, 15 December 1960, Page 7

Extension Of Wharf Press, Volume XCIX, Issue 29388, 15 December 1960, Page 7