Using a mole plough or sub-soiler and trailer, two men can lay thousands of feet of Modernite Piping in a day. All joints can be made with an adjustable spanner.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19590128.2.150.7.1
Bibliographic details
Press, Volume XCVIII, Issue 28805, 28 January 1959, Page 14
Word Count
30Using a mole plough or sub-soiler and trailer, two men can lay thousands of feet of Modernite Piping in a day. All joints can be made with an adjustable spanner. Press, Volume XCVIII, Issue 28805, 28 January 1959, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.