Article image
Article image
Article image
Article image

Using a mole plough or sub-soiler and trailer, two men can lay thousands of feet of Modernite Piping in a day. All joints can be made with an adjustable spanner.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19590128.2.150.7.1

Bibliographic details

Press, Volume XCVIII, Issue 28805, 28 January 1959, Page 14

Word Count
30

Using a mole plough or sub-soiler and trailer, two men can lay thousands of feet of Modernite Piping in a day. All joints can be made with an adjustable spanner. Press, Volume XCVIII, Issue 28805, 28 January 1959, Page 14

Using a mole plough or sub-soiler and trailer, two men can lay thousands of feet of Modernite Piping in a day. All joints can be made with an adjustable spanner. Press, Volume XCVIII, Issue 28805, 28 January 1959, Page 14