Article image
Article image
Article image
Article image

THE FIRST PILE being driven on the Kurow-Hakataramea bridge over the Waitaki river. The bridge, which is a link between Canterbury and North Otago, was damaged during heavy floods some months ago. Seven piles are to be replaced, and the bridge is closed to all traffic.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19580809.2.86

Bibliographic details

Press, Volume XCVII, Issue 28660, 9 August 1958, Page 12

Word Count
46

THE FIRST PILE being driven on the Kurow-Hakataramea bridge over the Waitaki river. The bridge, which is a link between Canterbury and North Otago, was damaged during heavy floods some months ago. Seven piles are to be replaced, and the bridge is closed to all traffic. Press, Volume XCVII, Issue 28660, 9 August 1958, Page 12

THE FIRST PILE being driven on the Kurow-Hakataramea bridge over the Waitaki river. The bridge, which is a link between Canterbury and North Otago, was damaged during heavy floods some months ago. Seven piles are to be replaced, and the bridge is closed to all traffic. Press, Volume XCVII, Issue 28660, 9 August 1958, Page 12