Article image
Article image
Article image
Article image

ADJUSTING A FLOODLIGHT at the rear of the Cathedral yesterday afternoon. Floodlights round the Cathedral have been attached to their permanent standards to conform with the underground wiring system in the Square. Before being re-erected, all the floodlights were cleaned and reconditioned.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19580607.2.174

Bibliographic details

Press, Volume XCVII, Issue 28606, 7 June 1958, Page 15

Word Count
42

ADJUSTING A FLOODLIGHT at the rear of the Cathedral yesterday afternoon. Floodlights round the Cathedral have been attached to their permanent standards to conform with the underground wiring system in the Square. Before being re-erected, all the floodlights were cleaned and reconditioned. Press, Volume XCVII, Issue 28606, 7 June 1958, Page 15

ADJUSTING A FLOODLIGHT at the rear of the Cathedral yesterday afternoon. Floodlights round the Cathedral have been attached to their permanent standards to conform with the underground wiring system in the Square. Before being re-erected, all the floodlights were cleaned and reconditioned. Press, Volume XCVII, Issue 28606, 7 June 1958, Page 15