Article image
Article image
Article image
Article image

DRILING FOR OIL

w new bore started in TARANAKI fcS-S.) NEW PLYMOUTH. May 12. umiing has begun at Ngamotu road. "? w , Plymouth, on the latest site fan!j C n oil search by the New Zeaw * l roleum Company, Ltd. This ?° r f; t0 be known a s Devon No. 2, will J- the third well in Taranaki sunk by the company. The plant used for other wells in the P evince has been transferred to I he Pesent site, about a mile west of even No. 1 bore. Drilling at the latter « discontinued within the last two months, and good time has been made “moving the heavy gear. no . w being worked on is approximately in the centre of a triangle presented by Devon No. 1 and two ells sunk about 12 years ago by other oinpanies. These two wells were said “show promising signs when drilling Tfl* a - de P th of about 3000 ft. lest boring in connexion with the Tm'l Zealand Petroleum Company. geological and geophysical sur- „ y is continuing in other parts of the province.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19430513.2.11

Bibliographic details

Press, Volume LXXIX, Issue 23946, 13 May 1943, Page 3

Word Count
179

DRILING FOR OIL Press, Volume LXXIX, Issue 23946, 13 May 1943, Page 3

DRILING FOR OIL Press, Volume LXXIX, Issue 23946, 13 May 1943, Page 3