BRIDGING THE RAN GIT AT A.—The massive ferro-concrete under-structure in the highway bridge being built over the north branch of the Rangitata river. This is a major work tn the £125,000 highway deviation scheme, which will save 8.7 miles on the journey from Christchurch to Dunedin.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19380430.2.132.7
Bibliographic details
Press, Volume LXXIV, Issue 22389, 30 April 1938, Page 21
Word Count
46BRIDGING THE RAN GIT AT A.—The massive ferro-concrete under-structure in the highway bridge being built over the north branch of the Rangitata river. This is a major work tn the £125,000 highway deviation scheme, which will save 8.7 miles on the journey from Christchurch to Dunedin. Press, Volume LXXIV, Issue 22389, 30 April 1938, Page 21
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.