Article image
Article image
Article image
Article image

BUILDING NEW TOTALISATOR AT ADDINGT ON,-Part of the massive framework of the moder totalisator being constructed at "the Addington trotting grounds. The cost will be about £33,000\ and it is expecte that the totalisator will be ready for the August meeting.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19370422.2.93.11

Bibliographic details

Press, Volume LXXIII, Issue 22073, 22 April 1937, Page 14

Word Count
41

BUILDING NEW TOTALISATOR AT ADDINGT ON,-Part of the massive framework of the moder totalisator being constructed at "the Addington trotting grounds. The cost will be about £33,000\ and it is expecte that the totalisator will be ready for the August meeting. Press, Volume LXXIII, Issue 22073, 22 April 1937, Page 14

BUILDING NEW TOTALISATOR AT ADDINGT ON,-Part of the massive framework of the moder totalisator being constructed at "the Addington trotting grounds. The cost will be about £33,000\ and it is expecte that the totalisator will be ready for the August meeting. Press, Volume LXXIII, Issue 22073, 22 April 1937, Page 14