A TRACTION ENGINE IN DIFFICULTIES.—The crew of a traction engine, engaged in driving the test piles for the new traffic bridge over the Ashley river on the Main North road, had an anxious time when the flood waters swept down the river after the recent heavy fain.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19350914.2.157.4
Bibliographic details
Press, Volume LXXI, Issue 21578, 14 September 1935, Page 24
Word Count
47A TRACTION ENGINE IN DIFFICULTIES.—The crew of a traction engine, engaged in driving the test piles for the new traffic bridge over the Ashley river on the Main North road, had an anxious time when the flood waters swept down the river after the recent heavy fain. Press, Volume LXXI, Issue 21578, 14 September 1935, Page 24
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.