Article image
Article image
Article image
Article image

nnCRFSS WORK ON THE ACHERON RIVER DIVERSION IN THE LAKE COLERIDGE AREA.—The of the dam across the Acheron River is now under z&ay, and a start has been made with the laying of the pipes to convey the water into ' /A Coleridge stream LEFT: Unloading the concrete pipes from a motor-lorry above the tram-line. CENTRE: Hauling the pipes along the tram-line by the pipe bench. RIGHT: A view of the Acheron River from the dam, showing the pipe-line on the right.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19301119.2.98.1

Bibliographic details

Press, Volume LXVI, Issue 20089, 19 November 1930, Page 13

Word Count
81

nnCRFSS WORK ON THE ACHERON RIVER DIVERSION IN THE LAKE COLERIDGE AREA.—The of the dam across the Acheron River is now under z&ay, and a start has been made with the laying of the pipes to convey the water into ' /A Coleridge stream LEFT: Unloading the concrete pipes from a motor-lorry above the tram-line. CENTRE: Hauling the pipes along the tram-line by the pipe bench. RIGHT: A view of the Acheron River from the dam, showing the pipe-line on the right. Press, Volume LXVI, Issue 20089, 19 November 1930, Page 13

nnCRFSS WORK ON THE ACHERON RIVER DIVERSION IN THE LAKE COLERIDGE AREA.—The of the dam across the Acheron River is now under z&ay, and a start has been made with the laying of the pipes to convey the water into ' /A Coleridge stream LEFT: Unloading the concrete pipes from a motor-lorry above the tram-line. CENTRE: Hauling the pipes along the tram-line by the pipe bench. RIGHT: A view of the Acheron River from the dam, showing the pipe-line on the right. Press, Volume LXVI, Issue 20089, 19 November 1930, Page 13